Content: 40401173123307.doc (121.00 KB )
Uploaded: 01.04.2014

Positive responses: 0
Negative responses: 0

Sold: 15
Refunds: 0

Seller: alevtina_sar

Ask a question

$0.87
TESTS


Task 1.


1.MANAGING - is the process of formulation and implementation of control actions, including:


1. collect, process, communication and decision-making;

2. The information processing and decision-making;

3. The management decisions.


2.Sut manufacturing process is to:


1. convert costs ("input") as a result ("Exit");

2. The results reflect the costs of production.


3.K factors of production include:


1. Occupational Health and fixed assets;

2. production revolving funds;

3. all of the options.


4. What is the main function of the production system:


1. output;

2. profit.


5.Polnaya production system of the organization is called:


1. The operating system;

2. The production system;

3. organizational system.


Task 2.


1.Proizvodstvenny management (Eng. Management production,) - a term that means:


1. The management of production;

2. management activities;

3. Production control.


2.Manual Lens production management are:


1. The production and manufacturing systems;

2. management activities;

3. The management and control in the workplace.


3.Po content objectives are divided:


1. on the technological, economic, and production;

2. The administrative, marketing, scientific, technical and social;

3. All the above.


4.Otlichie fixed assets from circulating that they transfer their value to the product with the help of their product:


1. not at once but in installments;

2. once rather than piecemeal.


5.Proizvodstvo - is:


1. The technically complex finished stage of the production process, has clear limits due to the peculiarities of the technology;

2. The manufacturing process has clear limits;

3. technically completed stage of a complex manufacturing process, due to the peculiarities of the technology.


Task 3.


1.Tehnologichesky process is:


1. The process by which changes shape, size, properties of the product;

2. a process that does not alter the shape, size and properties of the product;

3. To complete the process of the transition;

4. there is no right answer.


2. on the formula: T = S T piece i + / n - 1 / x / S T piece b - S m pieces m / duration of treatment is determined by the party at:


1. parallel;

2. parallel - sequential;

3. sequence;

4. there is no right answer.


3.Protsess labor as a result of which no product is created, it is:


1. Auxiliary PP;

2. the main PCB;

3. serving PP;

4. there is no right answer.


4.Netehnichesky process is:


1. The process which leads to a change in the shape, size and properties of the product;

2. The range of efficiencies for the realization of finished products;

3. The process, which does not change the shape, size and properties of the product;

4. there is no right answer.


5.Izdelie is:


1. The finished piece TP performed at one workplace;

2. any item of work to be manufactured in the workplace;

3. The basic structural unit of the PP;

4. there is no right answer.


Task 4.


1.Novaya technique in the making through the following steps:


1. scientific research, technical development, material development;

2. scientific research, project design development, production development;

3. scientific research, design and development of the technical, organizational preparation;

4. there is no right answer.


2. Development of the process is carried out:


1. after working on the design manufacturability;

2. to mining;

3. there is no right answer.


3.Stepen detailed design depends on:


1. The details of the type;

2. the type of production;

3. there is no right answer.


4.Otladka technical processes as a whole and completes the design documentation:

Responses

No feedback yet